| MORE CHILDREN ! | |
| The greatest challenge for Project Child at present is to increase the monthly Operating Income so that an additional 20 or 40 special needs children can be rescued from malnutrition, poverty and neglect. We have the space for the children but an increase in number will require additional caregivers. |  |
| FINISH THE JOB ! | |
| The main Casa de Luz building was designed for two floors. Without the 2nd floor finished with a roof, we have periodic leaks down into the first floor. Major financing is needed to finish the second floor roof at this time. |  |
 Unfinished second floor holding water |  First floor ceiling damage |
| | |
Walls have been erected by volunteers for the dining room, laundry and locker rooms. Funds are needed to pay local professionals to do the roof structures. |  Future dining room |
 Walls of future laundry room completed |  Locker room walls in progress |